top of page
Travel Polaroids

Photo Wall

JUDICIAL DITCH 25 PROJECT

IMG_1260.JPG
IMG_1261.JPG
IMG_1254.JPG

SWI'S

Side Water Inlets

 31 Completed in 2021

12 In Progress for 2022

PICTURES TAKEN IN BRAY TOWNSHIP

20211108_112927.jpg
IMG_1280.JPG

Picture of the Black River (or not) in Polk Centre Township.  Pennington County encountered the fifth driest growing season on record in 30 years.

IMG_0899.jpg

One septic system upgrade
was completed in 2021.

Noxious Weed Inventory Is Complete!

Weed Inventory Map.jpg

“Funding provided by the Minnesota Department of Agriculture Noxious Weed

and Invasive Plant Grant and BWSR CWMA Program Grant”

From Beginning To End:  The Hudson Project 

Before:   River bank erosion caused by concentrated flow of urban runoff.

Construction:   A drop pipe was installed that provides a stable path for the water to outlet into the Red Lake River and eliminate flow over the bank.

After:   Financial assistance was provided through the State Cost-share Program.

AIS Sampling on the Red River

No invasive species found, but a little friend was making the sample pipe his home!

bottom of page